The communities on either side of the A379 will be connected by a pedestrian/ cycle bridge, which will provide safe access for students from the Aphington side to the new school. The bridge as currently designed is in the form of an elegant parabolic arch. Documents relating to the bridge and access are below. (Unfortunately this site can’t show the original zoomable files – but these can be sent to you if you leave a contact email address)

By way of explanation, Chudleigh Road is at the very bottom left of the plan and the new school is off plan at the bottom right.
Below is an enlargement of the side view of the bridge/

You can download the zoomable pdf file here.